OPTIMIZATION OF CONSTRUCTION WASTE MANAGEMENT THROUGH AN INTEGRATED BIM API
Palavras-chave:
construction, waste, BIM, design, building.Resumo
Estimate waste generated in civil construction accurately is vital for minimizing them in the project stage. This vision allows designers to visualize and explore possible corrective measures in order to increase construction efficiency. In addition, it can enable contractors to identify critical processes in waste generation and plan control strategies. By integrating several projects into a single model, Building Information Modeling (BIM) can assist the solution of this challenge. The main goal of this work was to develop an integrated BIM API to optimize construction waste management. The chosen method for this research was Design Science Research (DSR). Throughout the development, one building, built with 3 (three) construction methods was evaluated. The result was a construction waste index in order to classify buildings according to their construction waste generation.
Referências
ABRELPE, Panorama dos resÃduos sólidos no Brasil, ABRELPE: BrasÃlia, 2016.
CBIC, Coletânea de implementação do BIM para construtoras e incorporadoras – Volume 1: Fundamentos do BIM, CBIC: BrasÃlia, pp. 1–124, 2016.
Construction and Demolition Waste; European Comission, Brussels, http://ec.europa.eu/environment/waste/construction_demolition.htm. Accessed on: 30 Apr. 2018.
Cheng, Jack C.P., Ma, Lauren Y.H., A BIM bases system for demolition and renovation waste estimation and planning. Waste Management, 33(6), pp. 1539–2551, 2013.
History and current state of waste management in Japan; MOE, Tokyo, http://www.env.go.jp/en/recycle/smcs/attach/hcswm.pdf. Accessed on: 30 Apr. 2018.
Lu, Weisheng et al., Estimating and calibrating the amount of building related construction and demolition waste in urban China. International Journal of Construction Management, 17(1), pp. 13–24, 2016.
PRISM ENVIRONMENT, Construction sector overview in the UK, Prism Envinronment: London, 2012.